Jean-Yves MAHÉ, Electrical Engineer
➜STX France, Chantier Naval de St Nazaire
How Caneco solutions can design electrical installations for cruise ships? Discover the STX France success story, made on the Shipyard of St Nazaire.
« Nowadays, with this kind of software, we can save a lot of time. If we had to do all the calculations manually, we would never meet the deadline for the construction of the ship. Our main goal is to reduce time spent on calculations. So the use of this software is the perfect choice. They are easy to use, have multi-manufacturing, respect the standards and allow us to save a lot of time ».